Motor starting loads: why running power is not enough

For pumps, compressors and other motor loads, check both steady operation and the starting transient.

Starting differs from running

A motor may briefly draw high current during starting, causing generator voltage and frequency dips. Successful starting depends on transient response, alternator capability, mechanical load, acceleration time and loads already running. Adding motor kW alone is insufficient.

Starting method changes the demand

Direct-on-line, star-delta, soft starters and variable-frequency drives have different current and torque characteristics. A universal “three times motor power” rule is not reliable. Soft starters and drives still require manufacturer input-current data, settings and compatibility checks.

An illustrative calculation only

Assume a balanced three-phase load at 400 V line voltage with a specified 300 A starting line current. Starting apparent power is approximately √3 × 400 × 300 ÷ 1000 = 208 kVA. This is not a recommended generator rating. Allowable voltage and frequency dips, starting duration and existing loads still need evaluation.

Prepare a useful starting-load inquiry

Send motor nameplates, starting or locked-rotor current, starting method and sequence, whether starting is loaded, and equipment voltage/frequency tolerances. Staggered starts may reduce simultaneous demand, subject to equipment supplier confirmation. If data is missing, begin with equipment photos and a load list.

Continue reading

Technical reference: Cummins

02 / Technical resources

Prepare these details before an inquiry

Equipment & loads

Equipment, quantities, nameplate photos, simultaneous loads and starting methods.

Site & operation

Installation town, voltage, frequency, phases, operating hours and environment.

Supply & delivery

Silent / open type, ATS, quantity, destination and required delivery date.

03 / Start an inquiry

Need help confirming the configuration?

Submit your requirements, then discuss a matching configuration using your equipment list.

Start an inquiry →

Continue reading

Choosing a Diesel Generator for an African Project: Loads, kVA and Site Conditions →Shipping a Diesel Generator to Africa: What to Confirm with Your China Forwarder →Generator After-Sales Support in Africa: Warranty, Spare Parts and Handover →How to Choose a 100 kVA Weichai-Powered Diesel Generator: 80 kW Buying Guide →50 Hz vs 60 Hz: what should you confirm before ordering? →Automatic transfer switches: what happens during an outage? →How to Compare Diesel Generator Quotations from China: A Checklist for Importers →Diesel Generator Imports to Kenya: What Buyers Confirm Before Ordering →Buying Diesel Generators for Resale: Planning Your First Order from China →Diesel Generator Factory Tests: What to Check Before Shipment →Generator voltage and phases: checking 400 V, 230 V and your loads →kW and kVA: how to compare generator power →Prime vs standby power: which rating should you use? →Buying a Used Diesel Generator from China: Inspection and Risk Checks →